JD Rail Machines
Fast Fit Rail / Road Crossing
60 Reasons why you should think about fitting
JD Rail “Fast Fit Rail / Road Crossing.”
Cost Saving Factors
Reason 1:
The argument goes:
Absolutely minimum components (in fact only 2 components).
Reason 3:
No disturbance to road.
3 point installation:
- Clear away excess ballast from top of sleepers (ties).
- Fit locking Saddles.
- Lower panels and check seating.
Road / Rail Crossing finished.
Reason 4: Minimal maintenance required – no wearing parts – Inspection only.
Reason 5: No damage to rail from excavator bucket teeth or rollers or vibration (this equipment is not necessary.)
Reason 6: No joint compounds required.
Reason 7: Does not come into contact with bitumen – no contamination of bitumen to Ballast or crushing of ballast from compaction equipment required by the
bitumen.
Fast and Easy Installation
Reason 8: In one day, it is possible to install 154m (500ft) with 4 men or even up to 308m (1000ft) with 8 men of Rail / Road Crossing.
Reason 9: Panels are 3 metre lengths for fast fitting. Covering six sleepers to maximize the sleeper strength and traffic weight distribution.
Reason 10: Quick installation, minimal personnel and equipment:
- Hiab or mini crane with 2 Tonne lift capacity.
- 2-man crew can fit double lane in 1 hour.
- 1 x 12 inch Adjustable spanner and 1inch socket and ratchet.
- No need for rail traffic speed restriction (work between trains)
- Minimal road Traffic disruption.
Reason 11: No university degree required to understand installation procedure.
Reason 12: No cement bonding or rubber accelerators or chemicals required, no complicated mixes, no confusing the crewmembers when labels are lost when
chemicals have been in storage.
Reason 13: No curing time necessary – ready for use (including the heavy haul vehicles) immediately after installation with no road or rail speed restrictions.
Track Maintenance
Reason 14: Specifically designed for fast track maintenance.
Reason 15: Each 3m panel can be removed and replaced in 5 minutes.
Reason 16: Removal of any 3m panel from any position, designed for easy inspection.
Reason 17: Easy removal and installation of panels, allows track geometry to be quickly checked.
Reason 18: Ballast Tamping can be achieved quickly with minimal disturbance to train schedules.
Reason 19: Rail Grinding can be achieved quickly with minimal disturbance to train schedules (only the centre panel has to be removed).
Reason 20: Brand new Road / Rail Crossing fitted in 1 hour both lanes.
Reason 21: Only 2 major components for finished panel installation.
Reason 22: No installation drawings required to undertake Track Maintenance.
Reason 23: Fixed interface between panel and road edge – No disturbance to road bitumen during track maintenance. No panels spreading – Distortion or
loose wobbly panels.
Reason 24: Panels do not come into contact with rail; therefore no contact means no damage to rail and components.
Reason 25: No removal of rods, deflector plates, securing chains, anchor nails, track jigs during maintenance periods.
Reason 26: During the long life of our product you will never again need:
Road / Rail Crossing Design features and applications
Reason 27: Carrying capacities:
|
Foot Path Specification |
|
Agriculture Specification |
|
“A’ class Road ,Highways and Docklands |
|
Mine Specification Heavy Duty |
|
Mine Specification Super Heavy Duty |
Reason 28: Specially designed for “Australia’s BHP Billiton and Rio Tinto” - Heaviest rail in the world. To withstand the harsh Australian Outback conditions and
handle the largest Caterpillar – Komatsu - Haulpac’s in production with capacity for greater weights.
Reason 29: Tailored coloured Rail Crossings to suit the client.
Reason 30: Expected Life 30 years + under normal use.
Reason 31: Our Rail / Road Crossing will fit any rail gauge and fit to wood, steel and concrete sleeper of any shape or design.
Reason 32: Designed for Docklands, or up to 500 Tonne Haulpac’s.
Reason 33: Special Mine specification sleepers (Extra Heavy duty) 100 tonne + capacity per sleeper (tie) can be supplied on request. Also see our Heavy Duty
Road support panels (never repair the road approach to our crossover).
Reason 34: Easy and fast to install – uniform components – No curing or drying time.
Reason 35: Easy fit Deflector plates.
Reason 36: Shock absorbing design inbuilt.
Reason 37: Only tools required is a 12 inch adjustable spanner,1 inch Socket and ratchet and 2 Tonne truck crane or similar.
Reason 38: The triangulated locking design prevents wear during movement - energy absorber when flexing, and assist water to run off quickly.
Reason 39: Supplied up to 200mm (8 in) thick for long life and strength – (dependant on rail size and weight).
Reason 40: Crossovers are double saddle moulded to sleepers for maximum depth, weight, strength and non-movement improving the sleeper integrity. With
non friction energy absorbing material built in for Crossover integrity.
Reason 41: The panels do not rely on the rail head to secure it.
Reason 42: Minimal road closure required during installation and maintenance (30 minute, one lane open one closed).
Reason 43: Ideal for any emergency road / rail crossover situations.
Reason 44: Short-term road / rail crossing locations for construction jobs.
Reason 45: Components can be galvanized for tropical or wet weather conditions (small additional cost.)
Reason 46: Designed by trackmen with 40 years experience working on track on the Heaviest Haul Rail Track in the World (Pilbara Region Western Australia).
Safety Features
Reason 47: The safest double saddle molded triangulated locking design. Field side to Field side locked in.
Reason 48: Designed to Bridge Design Code AS 5100 – 7 supplement 1, 2006.
Reason 49: Excellent anti-skid properties.
Reason 50: Electrical Double insulated Tested.
Reason 51: Fire resistant, Cyclone proof, UV resistant – non resin compound to break down and blow away.
Reason 52: Panels can be removed at any time in any order, and refitted in any order (panels are manufactured in identical moulds).
Reason 53: Two lifting points, eliminates manual lifting (Hire our lightweight power lifting trolley during maintenance).
Reason 54: Smooth safe ride (no bumps).
Reason 55: Also our Road Support Panels system, supports the road, prevents road collapse and assists road maintenance.
Reason 56: Our double saddle triangulated interlocking design protects and gives support to the track sleepers (ties).
Reason 57: No compression fitting à No injuries during installation and maintenance.
Reason 58: No panels popping up because of compression fitting (endangering the public or tearing off Locomotive fuel tanks, air brake lines ect.
Reason 59: J.D Rail Fast Fit Panels comply with all railway laws–Bridge code structures and all Main Roads and Highway regulations(expected life 30 years +).
Reason 60: Protect the public – Fast Fit Road / Rail Crossovers that:
- Does not shrink.
- Does not go uneven or shift or split.
- Does not go soft or wobble.
- Child and vandal proof.
- No exposed components, uniform height as pavement.
Return to previous page
|